ICT705 | HOW GE COULD INTEGRATE AND MANAGE | DATA AND SYSTEM INTEGRATION
Assignment Task
Assume you are a member of the GE Enterprise Information Architecture team, and asked to research an information centric solution to achieve their dynamic ‘Industrial Internet’ as described in the case study. Starting with your knowledge of Enterprise Information Architecture Reference Architecture, report on how GE could integrate and manage its many disparate information systems and data feeds into a unified Industrial Internet’.
Your target audience is executive business people, who have extensive business experience but limited computing knowledge.
Unfortunately, you have to complete this task in a short period (< 5 weeks), without any direct information source from the business body. The design you provide will mainly depend on your experience, understanding, and vision for the information system.
However, you are free to design and include any functional and non-functional components that you feel important in GE’s case. Keep in mind that there are no correct or wrong answers in the design as long as they are reasonably explained.
ORDER NOW
The following is a recommended outline for the assignment. A complete marking sheet is attached at the end of this document.
|
Title |
Major Outcomes |
1 |
Introduction |
|
2 |
EAI RA |
2 Diagrams and explanations based on IBM EAI RA |
|
|
Templates: |
|
|
– Architecture Overview Diagram |
|
|
– Component Relationship Diagram |
3 |
Information Management |
Discuss and design strategies to integrate the multiple |
|
and Integration |
data sources developed and used by different teams for |
|
|
various business units and departments. |
4 |
Application and Data |
Discuss various cloud options and their suitability. |
|
Storage Infrastructure |
Design a cloud infrastructure strategy. |
|
Design |
|
5 |
Application and Service |
There are many different types of applications and |
|
Integration |
services coexisting in the company, including legacy |
|
|
applications, internal Web services, and external Web |
|
|
services. Some external services are provided by |
|
|
business partners and others are from public service |
|
|
providers such as Google Map and Google Search. |
|
|
Discuss and design service and application integration |
|
|
strategies. |
6 |
Conclusion |
|
100% |
90% |
75% |
65% |
50% |
25% |
0 |
Outstanding: |
High |
Distinction: |
Credit: |
Pass: |
Fail: |
Not |
|
Distinction: |
|
|
|
|
Submitted: |
An outstanding |
An excellent |
More than |
Competently |
Satisfactorily |
Did not |
No attempt |
attempt – well |
piece of work |
competently |
meets the |
meets the |
sufficiently |
made or |
formatted and |
that meets all |
meets the |
criteria as |
criteria. |
meet the |
different from |
professionally |
the specified |
criteria |
specified with |
|
criteria to |
what is |
presented |
criteria with |
specified with |
few minor |
|
pass. |
acceptable |
piece of work. |
very minor |
only minor |
mistakes or |
|
|
|
|
omissions or |
mistakes or |
omissions. |
|
|
|
|
mistakes |
omissions. |
|
|
|
|
ICT705 Data and System Integration
The following guidelines will be used in marking each section of the assignment:
Report Format
Your report should be no less than 2,000 words and it would be best to be no longer than 3,000 words.
The report MUST be formatted using the following guidelines:
- Paragraph text – 12 point Calibri single line spacing
- Headings – Arial in an appropriate type size
- Margins – 2.5cm on all margins
- Header – Report title
- Footer – page number (including the word “Page”)
- Page numbering – roman numerals (i, ii, iii, iv) up to and including the Table of Contents, restart numbering using conventional numerals (1, 2, 3, 4) from the first page after the Table of Contents.
- Title Page – Must not contain headers or footers. Include your name as the report’s author.
- The report is to be created as a single Microsoft Word document . No other format is acceptable and doing so will result in the deduction of marks.
Referencing
The report is to include (at least 5) appropriate references and these references should follow the Harvard method of referencing. Note that ALL references should be from journal articles, conference papers, technical papers or a recognized expert in the field. DO NOT use Wikipedia as a reference. The use of unqualified references will result in the deduction of marks.
Submission
The completed assignment is to be submitted to Blackboard Task 1 by the due date of
The assignment will be assessed according to the marking sheet. Late submission will be penalised according to the policy in the course outline. Please note Saturday and Sunday are included in the count of days late.
Assignment Return and Release of Grades
Assignment grades will be available on the blackboard in two weeks after the submission. An electronic assignment marking sheet will be available at this time.
Where an assignment is undergoing investigation for alleged plagiarism or collusion the grade for the assignment and the assignment will be withheld until the investigation has concluded.
Assignment Guidelines
This assignment will take a number of weeks to complete and will require a good understanding of Enterprise Information Architecture for successful completion. It is imperative that students take heed of the following points in relation to doing this assignment:
- Ensure that you clearly understand the requirements for the assignment – what has to be done and what are the deliverables.
- If you do not understand any of the assignment requirements – Please ASK the Lecturer or your tutor.
- Each time you work on any aspect of the assignment reread the assignment requirements to ensure that what is required is clearly understood.
ICT705| How GE could be integrated & managed| Data & System Integration assignment help
In this particular assessment task, the student is required to assume that he/she is actually the member of the enterprise information architecture team of GE and has to carry out a research on the information centric solution for achieving the dynamic Industrial Internet which is described in the case study. On the basis of the knowledge of Enterprise Information Architecture, you have to prepare a report on how the company can integrate and also manage all the disparate information system and also data feeds into a single industrial internet. The word limit of report must be in between 2000 to 3000. You have to produce the final paper in a single MS word document. Five most relevant references must be included and should follow the Harvard referencing.
The data system and integration involves the study of the operational system and also data storage across the varied paths as well as areas. Now the students of the subject can avail the top class ICT705| How GE could be integrated & managed| Data & System Integration assignment help from our online academic assistance portal. Our company offers the top class and original subject papers which fetch you extremely good grades in the semester. All you need to do is to communicate your individualized project requirements to our customer support executives and our writing team delivers you the top quality solution in minimum turnaround time. Our expert can help you out in writing solution for any sort of subject assignment. Call us today.